Sign In | Join Free | My ledscreensign.com |
|
Brand Name : TOBO
Place of Origin : CHINA
MOQ : 1pc
Price : negotiation
Payment Terms : T/T, Western Union, MoneyGram
Supply Ability : 300Ton/month
Delivery Time : 5-10workdays
Packaging Details : PLY-wooden case or as for clients' requirements
Material : Alloy
Shape : Equal,Customer's Request
Connection : butt welded
Technics : Forged
Head code : round
Size : Customized Size
Application : Industry,gas and oil pipes
Standard : ANSI,DIN,BS,ASME B16.9,GB
Surface treatment : High Polished
Packing : Wooden Case,In wooden cases or pallets,or as per clients' requirements
Color : White
Usage : Joining Pipe Lines,pipe-line connection
Material Grade | Nickel Alloy Steel | ASTM/ASME B/SB564 UNS N02200(NICKEL 200), UNS N04400(MONEL 400), | |
UNS N08825( INCOLOY 825), UNS N06600(INCONEL 600), | |||
UNS N06601(INCONEL 601), UNS N06625(INCONEL 625), UNS N10276(HASTELLOY C276), | |||
ASTM/ASME B/SB160 UNS N02201(NICKEL 201), ASTM B/SB472 UNS N08020(Alloy 20) | |||
Copper Alloy | ASTM/ASME B/SB151 UNS C70600(CuNi 90/10), C71500(CuNi 70/30) | ||
Stainless Steel | ASTM/ASME A/SA182 F304,304L,304H,309H,310H,316,316H,316L,316LN, | ||
317,317L,321,321H,347,347H | |||
Duplex and Super Duplex Steel | ASTM/ASME A/SA182 F44,F45,F51,F53,F55,F60,F61 | ||
Carbon steel | ASTM /ASME A/SA105(N) | ||
Low Temp Carbon Steel | ASTM/ASME A/SA350 LF2 | ||
High Yield Carbon Steel | ASTM/ASME A/SA694 F52, F56 F60, F65, F70 | ||
Alloy Steel | ASTM/ASME A/SA182 GR F5,F9, F11,F12,F22,F91 | ||
Titanium | ASTM/ASME B/SB381 Grade 2, Grade 5, Grade 7 |
Item name | ASTM16.5 Gr1Titanium Welding Neck Flange(WN) DN10-DN600 |
Standard | ASTM 381 ,ASME/ANSI B16.5,DIN2630~2633,BS etc |
Material | Gr1, Gr2 ,Gr5 |
Size | 1/2''~80''(DN10~600) |
Thickness | SCH20, SCH30, SCH40, STD, SCH80, SCH100, SCH120, SCH160, XXS |
Pressure rating | 0.6~32Mp |
(DIN) PN6,PN10,PN16,PN25 though PN250 | |
(ASNI) CL150,CL300,CL600,CL900,CL1500 | |
Working temperature | -60°C~250°C |
Application | 1.Chemical industry 2. Petrochemical industry 3. Machining field,Automobile field,etc 4. Desalination of sea water 5. Textile printing and dyeing 6. Mobile phone component field |
process Flow
Third party inspection that is preferred by new customers are proved to be convincing. Through years' of operation, M/S Chengdu Derbo has established stable contact with world famous third party inspection authorities like BV, SGS, INTERTEK, etc, and more than 5000M.Tons of steel pipes/tubes from Chengdu Derbo have been inspected by them.
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.
![]() |
10″ SCH160 RTJ 2500# ASME B16.5 Butt Weld Fittings GR F51 Flange Images |